Project Detailsx
Project Overviewx
The project includes a 17-level parking garage that consists of five levels with an “L” shaped sub-grade parking accessible from Colorado Street and 12 levels of above-grade parking located directly beneath the office floors accessible from 7th Street. The subterranean loading dock is accessible from Colorado Street and an urban park is included above the “L” portion of the garage. The office building and garage consist of a cast-in-place concrete structure with a full curtainwall exterior.
The scope of work on the project includes demolition and implosion of the existing eight-story building and parking deck on 3/4 of City Block 71, as well as the historic restoration of the former Claudia Taylor Johnson Hall building connecting the office building's commercial environment with the cultural, recreational and retail activities as an open-air market space.


